New in ONX, waits priced for every bay

The floor reports
before first shift.

ONX reads the cameras you already own, prices every wait against the job in your ERP, and sends the plant a morning brief with decisions.

Today

Thu, Nov 5, shift AEdit
Good morning, Sam

Yesterday's waits cost $6,240. Four decisions are ready for the 7:00 huddle.

Bay 3, camera 0709.52 Waiting, 42 min
Yesterday by bay
WorkWaiting
Crane 2 by half hour
1.7 h
double-booked
Decisions for 7:00
4 open
Recovered this week
72%
of goal
$10.8k
12%vs last week
Why did Bay 3 lose six hours?

Today

Edit
Why did Bay 3 lose six hours yesterday?
Reasoning
What happened

Bay 3’s crew of four lost 6.2 h yesterday, $1,860 at loaded rates: 24.8 fitter-hours at $75. Most of it, 3.9 h, came in three long waits while Crane 2 was booked by NB-21 fit-up and by the yard at once.

Bay 3 crew waiting
Crew of four, minutes per half hour, camera 07
Lost hours by cause
Bay 3 crew, yesterday
6.2 h
Why

Crane 2 was double-booked — Crane 2 bookings show the yard’s loading landing on NB-21 fit-up three times, for 70 to 86 minutes each, with the crew standing by.

Plates came late — Plate arrivals reached the bay at 7:20, the third late start this week.

What to change

Fit-up on the 7:00 slot, loading at 13:00 — Crane plan fits both jobs without an overlap and gives back about 2.1 h a day.

Draft tomorrow's crane plan

One brief for
the whole plant

Built on your cameras

No new hardware. ONX reads the CCTV you already own and turns every wait on the floor into a line on the job.

Priced against the job

Every idle minute is matched to the job in your ERP and priced at loaded rates.

Ready before first shift

A short brief lands at 6:00 with the three decisions that matter today.

Illustrative numbers and generated footage.

Illustrative numbers. Style study after Steep; fonts are Geist and Newsreader, free under the SIL Open Font License.